Feasibility & proyecto básico
Planning verification and the document the municipality approves.
- Basis
- Fixed fee by built area
- Invoiced
- On delivery of the filing set
Technical Office & Licensing
Our technical office prepares the proyecto básico and proyecto de ejecución, files the licence with the Ayuntamiento, and carries dirección de obra through to the first-occupancy certificate. Every stage has a named deliverable and a condition that must close before the next one opens.
Open any stage to see who produces the document, how long the step usually runs in Almería, and what it unlocks. Delays are almost always a missing input, not a slow office.
We read the plot or property against the municipal plan before drawing anything: permitted use, buildable area, setbacks, height limits and any protection that would rewrite the brief.
The básico fixes what the municipality approves: volume, layout, use and compliance with the planning ordinance. It is the document that can be filed for the licence, and the one that is expensive to change later.
We file the obra mayor application, pay the tax base on your behalf when instructed, and answer municipal requirements in writing. Review time depends on the municipality and on how complete the filing was on day one.
The executive project is what the site actually builds from: structural calculations, installation drawings, construction details and the measured schedule that turns the design into a priced quantity list.
Technical direction runs for the whole build: inspections at the points that cannot be reopened, written instructions instead of verbal changes, and progress certificates that release each staged payment.
The final stage converts a finished building into a usable, registrable one. Without this file, utility contracts, registry updates and resale all stall.
Stages can be appointed separately. Most clients take the full route because a licence filed on someone else’s drawings is rarely cheaper once requirements arrive.
Planning verification and the document the municipality approves.
Filing, tax settlement and written handling of municipal requirements.
Structure, installations, details and measured quantities for construction.
Inspections, certifications and the final compliance file.
These are quoted at cost with the receipt attached, so the professional fee stays separate from municipal and third-party charges.
Progress, photographs, open decisions and anything that threatens the programme, issued on a fixed day.
Foundations, structure, concealed services and waterproofing are recorded before they are covered up.
Every change is issued as a numbered instruction with its cost and schedule effect stated before work proceeds.
Staged payments follow certified quantities, so the amount released matches the work actually verified on site.
A technical lead will review the location, project stage and available documentation, then reply with the exact filings required next and what they depend on.